GOVERNMENT OF ODISHA |
![]() |
JAGATSINGHPUR IRRIGATION DIVISION
Jagatsinghpur
Irrigation Division is having four irrigation Sub-Division i.e. Biluakhai,
Jagatsinghpur, Alipingal and Balikuda. Total ayacut of this division is 34870
Ha. Out of which Jagatsinghpur District possesses 34101.00 Ha. and
A)
Irrigation Potential of Jagatsinghpur District.
|
Sl.No. |
Name
of Canal |
Length
of |
Length
of Distributary &
Minor |
Ayacut
Area in Ha. |
|
1. |
|
52.37
Km. |
614.18
Km. |
34101.00 |
|
Sl.No. |
Details of Embankments |
Length of embankment in Km. |
|
1. |
Capital embankment |
99.12
Km. |
|
2. |
OAE |
37.00
Km. |
|
3. |
TRE |
11.40
Km. |
|
4. |
Saline Embankment |
53.90
Km. |
|
|
Total:- |
201.42 Km. |
| STATUS OF WORKS AS ON 05.2009 | Jagatsinghpur Irrigation Division |
| 1 | Improvement to left bank of 19 Main Canal from RD.1.30Km. to 3.30Km. | 20.00 | 20.00 | 19.80 |
21.01.2009 20.04.2009 |
Work in Progress |
| SL.No. | Name of the Work | Allotment in 08-09 | Estimate Cost in Lakhs | Tendered Amount in Lakhs | Date of Commencment/ Completion | Present Status of Work |
| 1 | 2 | 3 | 4 | 5 | 7 | 8 |
| R.I.D.F.-XII. | ||||||
| 1 | Protection to scoured bank C.E No.87A on Devi Left Embkt. providing spur at RD 60.33 Km. with launching aprons near village Bhandisahi (Under RIDF-XII) | 320.47 | 320.47 | 275.41 |
04.03.2008 03.02.2009 |
90% work completed |
| 2 | Protection to scoured bank C.E No.87A on Devi Left Embkt. providing spur at RD 60.50 Km. with launching aprons near village Bhandisahi (Under RIDF-XII) | 395.98 | 395.98 | 305.69 |
27.02.2008 26.01.2009 |
90% work completed |
| C. R . F | ||||||
| 1 | Protection to scoured bank C.E No.87A on Devi Left Embkt. providing spur at RD 60.650 Km. with launching aprons. | 333.00 | 333.00 | 329.79 |
20.02.2008 19.02.2009 |
Work Completed |
| 2 | Repair & restoration to Jaisol Minor of Machhagaon Canal. | 26.73 | 26.73 | 26.18 |
26.02.2009 25.05.2009 |
Work in Progress |
| LUMP RIVER EMBANKMENT | ||||||
| 1 | Restoration to Biluakhai left embankment from RD.21.50 to 21.80Km. and renovation of low level spurs near village Birabarpatna. | 4.00 | 4.00 | 3.84 |
17.02.2009 16.03.2009 |
Work Completed |
| SPECIAL ROAD WORKS FOR THE YEAR 2008-09 | ||||||
| 1 | Improvement to left bank of 19 Main Canal from RD.1.30Km. to 3.30Km. | 20.00 | 20.00 | 19.80 |
21.01.2009 20.04.2009 |
Work in Progress |
| 2 | Improvement to left bank road of Disty. No.19A from RD.17.00Km. to 19.50Km. | 20.00 | 20.00 | 19.80 |
21.01.2009 20.04.2009 |
Work in Progress |
| 3 | Improvement to left bank road of Disty. No.8 from Ayar to Redhua from RD.8.21Km. to 10.90Km.(WBM) | 15.00 | 15.00 | 15.00 |
21.01.2009 20.04.2009 |
Work Completed |
| 4 | Improvement to Devi left bank road from RD.57.00Km. to 62.00Km. | 46.00 | 46.00 | 45.50 |
21.01.2009 20.05.2009 |
Work in Progress |
| 5 | Improvement to Machhagaon Canal embankment Road from Jagatsinghpur college square to Somanath Hata from RD.28.00Km. to 35.50Km(Working RD.29.50 to 31.00Km.) | 18.00 | 18.00 | 13.00 | 28.02.2009 27.04.2009 |
Work in Progress |
| 6 | Improvement to Machhagaon Canal embankment Road from Jagatsinghpur college square to Somanath Hata from RD.28.00Km. to 35.50Km(Working RD.31.00 to 35.50Km.) | 12.00 | 12.00 | 8.90 | 28.02.2009 27.04.2009 |
Work in Progress |
| 7 | Renovation of low level spur at Rahamba on Devi left Embankment from RD 9.30Km to 9.50Km. | 24.92 | 24.92 | Tender receipt & Agreement to be drawn shortly | ||
| 8 | Renovation of Spur No. 3 at Daleighai of Kathajori Left Embankment at RD 11.804Km. | 24.97 | 24.97 | Tender receipt & Agreement to be drawn shortly | ||
| 9 | Renovation of low level spur at Rahamba on Devi Left Embankment from RD 9.500Km to 9.80Km. | 30.00 | 30.00 | Tender invited shortly | ||
| STATUS OF BREACH CLOSING AS ON 05.2009 | Eastern Circle Cuttack |
| SL.No. | Location of Breach | breach in Mtr. | Estimate Cost in Lakhs | Tender Amount in Lakhs | Date of Commencment/ Completion | Present Status of Work | |
| 1 | 2 | 3 | 4 | 5 | 7 | 8 | |
| (A) | FDR WORKS FOR THE YEAR 2008-09 (River Breaches) | ||||||
| 1 | FDR to Biluakhai right embankment from RD.13.660 km.to 13.800Km at Nilamahal sluice (Working from RD.13.650Km. to13.800Km.) | 150 Mtr. | 37.76 | 37.76 | 02.01.2009 02.05.2009 |
Work in Progress | |
| 2 | FDR to Devi left embankment from RD.10.600 to 10.625Km. at Rahamba (Working from RD.10.595Km. to 10.650Km.) | 55 Mtr. | 9.00 | 9.00 | 02.01.2009 02.05.2009 |
Work Completed | |
| 3 | FDR to Biluakhai right embankment at Naharbadi from RD.10.200Km. to 10.450Km.(Working RD.10.160Km. to 10.365Km.) | 250 Mtr. | 94.89 | 93.46 |
28.02.2009 27.05.2009 |
Work in Progress | |
| 4 | FDR to Biluakhai right embankment at Bagalpur from RD.7.600Km. to 7.715Km.(Working RD.7.540Km. to 7.740Km.) | 112 Mtr. | 53.17 | 51.15 |
21.01.2009 20.05.2009 |
Work in Progress | |
Mahanadi South Division, Cuttack
| Status of Breach closing works in Jagatsinghpur District as on May'2009 | ||||||||||||
| Sl. No |
Name of Embankment | Length of breach (in Mtr.) |
Estimated cost (in Lakhs) |
Tendered/ Agrt. Amount ( in Lakhs ) |
Name of Agency | Date of Coomencement/ Completion |
Present status of Work | Probable
cumulative Expenditure till 3/09 ( Rs.in Lakhs) |
Expenditure Inurred till 19th May 09 |
Balance Expenditure to be made during March | Remarks | |
| 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | ||
| A)
RIVER EMBANKMENT |
||||||||||||
| 1 | OAE No.61 (B) on Paika left Muraripur ( Bilaspur ) RD 4.700 to 4.800 Km |
150 Mtr |
87.00 | 75.29 | M/s Dakshya Construction | 22.12.08 21.06.09 |
Work under Progress | 50.00 | 47.39 | 20.00 | Earth work completed. Revetment packing is under progress | |
| 2 | OAE No.61 (B) on Paika left. Tipiri RD 8.800 to 8.820 Km |
20 Mtr |
12.00 | 11.13 | Parthasarathi Rout | 13.01.09 12.02.09 |
-do- | 11.13 | 5.23 | 4.00 | -do- | |
| 3 | OAE No.61 (B) on Paika left Nuasahi RD 11.000 to 11.030 Km |
30 Mtr |
7.00 | 9.11 | Anam Ch. Behera | 28.01.09 27.02.09 |
-do- | 9.11 | 9.10 | 3.00 | -do- | |
| 4 | OAE No.62 (B) on Paika right Gobardhanpur RD 19.300 to 19.400 Km |
35 Mtr |
60.00 | 15.08 15.67 16.60 |
Sumanta Kumar Behera Subas Kumar Sahoo Debakanta Mallick |
13.01.09 12.03.09 |
-do- | 40.00 | 30.74 | 16.00 | ||
| 5 | OAE No.62 (B) on Paika right Badabalikani RD 26.250 to 26.375 Km |
125 Mtr |
67.00 | 61.95 | Bikram Rout | 28.01.09 27.07.09 |
-do- | 15.00 | 33.29 | 10.00 | -do- | |
| 6 | OAE No.77(B) on Mahanadi left Bifurcation point of Paika & Mahanadi (Itatikiri) RD 0.150 to 0.200 Km. |
50 Mtr |
24.00 | 24.61 | Saroj Chhotray | 13.01.09 12.03.09 |
-do- | 15.00 | 7.87 | 5.00 | -do- | |
| 7 | OAE No.77(B) on Mahanadi left Kolta RD 4.550 to 4.700 Km. |
40 Mtr |
31.00 | 25.54 | Malik Suleman | 22.12.08 21.02.09 |
-do- | 20.00 | 19.26 | 7.00 | -do- | |
| 8 | OAE No.77(B) on Mahanadi left Olagada RD 11.380 to 11.500 Km. |
120 Mtr |
68.00 | 73.02 | Bikram Rout | 22.12.08 21.02.09 |
-do- | 30.00 | 64.43 | 25.00 | -do- | |
| 9 | OAE No.77(B) on Mahanadi left Tartol RD 14.700 to 14.725 Km. |
25 Mtr |
19.00 | 18.95 | Ashok Ku Uttarsingh Mohapatra | 06.12.08 05.02.09 |
Work Completed | 15.00 | 18.93 | 2.00 | ||
| 10 | OAE No.77(B) on Mahanadi left Boulanga RD 15.200 to 15.350 Km. |
150 Mtr |
77.00 | 81.99 | Sudhakar Pradhan | 09.02.09 08.08.09 |
Work under Progress | 75.81 | 10.00 | Earth work completed. Revetment packing is under progress | ||
| 11 | OAE No.77(B) on Mahanadi left Balikani RD 25.000 to 25.150 Km. |
150 Mtr |
32.00 | 25.64 | Malik Suleman | 22.12.08 21.02.09 |
-do- | 20.00 | 18.99 | 11.00 | -do- | |
| 12 | Teramanpur Gherry on Mahanadi right at RD 59.400 Km Teramanpur at RD 0.700 to 0.720 Km |
20 Mtr |
11.00 | 11.56 | Umesh Ch Parida | 13.01.09 12.02.09 |
-do- | 5.00 | 9.13 | - | -do- | |
| 13 | Teramanpur Gherry on Mahanadi right at RD 59.400 Km Teramanpur at RD 1.700 to 1.725 Km |
25 Mtr |
16.00 | 15.67 | Maheswar Sahoo | 05.12.08 04.01.09 |
-do- | 15.67 | 11.10 | - | -do- | |
| 14 | C.E.No.78 (A) on Mahanadi right Teramanpur RD63.030 to 63.080 Km |
30 Mtr |
146.00 | 153.37 | Keshab Chandra Mohanty | 18.02.09 17.10.09 |
-do- | 70.00 | 63.39 | 15.00 | -do- | |
| 15 | Badpal Gherry on Mahanadi right at RD.63.100 Km Badapal at RD 00 to 0.180 Km |
180 Mtr |
36.00 | 36.00 | Sukhendu Prasad Das | 13.01.09 12.02.09 |
Work under Progress | 36.00 | 30.56 | 5.00 | Earth work completed. Revetment packing is under progress | |
| 16 | Phulbarei Gherry on Mahanadi right at RD.78.60 Km Phulbarei RD 0.700 to 0.980 Km |
280 Mtr |
17.00 | 16.60 | Amiya Mohapatra | 22.12.08 21.01.09 |
Work Completed | 16.60 | 9.13 | - | ||
| 17 | Jhimani to Bhitergarh, Bhuyanpal Gherry & Joker Gherry Location:-Dalimpur(RD2.250 Km) Bhuyanpal(RD2.200 Km) & Joker(RD 2.150 Km) |
30 Mtr |
8.00 | 8.00 | Nishakar Nayak | 28.01.09 27.02.09 |
-do- | 8.00 | 4.06 | 5.00 | ||
| 18 | Saunlia left & right S left:-RD 3.60,5.45,6.15&10.94 Km S right:-RD7.00,7.10,7.26 &8.00 Km Nagari Creek |
45 Mtr |
12.00 | 12.00 | Renuka Sasmal | 13.01.09 12.02.09 |
-do- | 7.00 | 3.10 | 4.00 | ||
| 19 | Japa to Dhobei Thakurnali,Japa,Kaliakana |
7 Mtr |
7.00 | 7.00 | Dinabandhu Nayak | 28.01.09 27.02.09 |
-do- | 7.00 | 5.88 | 4.00 | ||
| 20 | Baragudipada to Khatikulada
& Harishpur West Location:- Bhajakhia(8.50Km), Patua(10.05 KM) Gaiparia(10.60 Km) Harishpur West:-RD 0.90, 1.45, 2.75, 2.85 & 11.70 Km |
25 Mtr |
8.00 | 8.00 | Chhaila Behera Goutam Das |
13.01.09 12.02.09 |
-do- | 8.00 | 8.00 | 3.50 | ||
| 21 | Ramtara Gherry & Harishpur East. Location:-Ramatara Gherry(4.50, 4.65 &4.78 Km) Harishpur East(14.50 Km) |
60 Mtr. |
14.00 | 14.00 | Tulsiranjan Das Renuka Sasmal |
28.01.09 27.02.09 |
-do- | 14.00 | 14.00 | - | ||
| Total | 759.00 | 736.78 | 412.51 | 489.39 | 149.50 | |||||||
| POST FLOOD BREACH | ||||||||||||
| 1 | FDR to scoured protection to C.E No-78(A) on Mahanadi right at Musadiha from RD 2.885 to 3.030 & RD 3.280 to 3.540 Km. | 45 Mtr. | 240.00 | 240.00 | 40.00 | - | - | Tender accepted & aggt to be drawn soon. | ||||
| Total | 240.00 | 240.00 | 40.00 | - | - | |||||||
| Status of Development works in Jagatsinghpur District as on May'2009 | ||||||||||||||||
| Sl. No |
Period of Occurrence | Name of
River / Canal |
Name of District | Name of Block | Name of Constitutency | Name of Work | Allotment in 08-09 (in Lakhs) |
Estimated
cost (in Lakhs) |
Tendered/
Agrt. Amount ( in Lakhs ) |
Name of Agency | Date of
Coomencement/ Completion |
Present status of Work | Probable
cumulative Expenditure till 3/09 ( Rs.in Lakhs) |
Expenditure Inurred till 19th March 09 |
Balance Expenditure to be made during March | Remarks |
| 1 | 2 | 3 | 4 | 5 | 6 | 2 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | ||
| A) | FLOOD CONTROL WORKS | |||||||||||||||
| 1 | Improvement to Saline Embankment of Ramatara Gherry from RD 1.920 to 2.082 Km. | 10.00 | 10.00 | 9.41 | Hemanta Kumar Sahoo | 01.09.08 30.09.08 |
Work Completed | - | 5.62 | - | ||||||
| 2 | Improvement to Saline Embankment from Irribina to Guamunda from RD 7.186 to 7.387 Km. | 10.00 | 10.00 | 9.42 | Dinabandhu Nayak | 30.07.08 29.08.08 |
-do- | - | 8.57 | - | ||||||
| 3 | Raising & Strengthening of Surua left Embamkment on 95(B) from RD 15.00 to 16.00 Km ( Working RD 15.720 Km to 16.00 Km ) | 20.00 | 20.00 | 19.91 | Susanta Kumar Swain | 28.01.09 27.03.09 |
Work under Progress | 19.91 | 18.34 | - | ||||||
| Total | 40.00 | 40.00 | 38.74 | 19.91 | 32.53 | - | ||||||||||
| B) | CENTRAL SPONSORED PROJECTS | |||||||||||||||
| 1 | Protection to Paika right embankment from RD 16.600 to 18.400 Km | 140.00 | 140.00 | 150.00 | Classic Super Construction | 12.11.08 11.09.09 |
Work under Progress | 140.00 | 130.00 | - | ||||||
| 2 | Protection to scoured bank C.E No-78(A) on Mahanadi right embankment from RD 80.490 Km to 80.800 Km at Choumuhani | 227.00 | 227.00 | - | Classic Super Construction | 26.02.09 25.12.09 |
-do- | 160.00 | 137.93 | 137.93 | ||||||
| Total | 367.00 | 367.00 | 150.00 | 300.00 | 267.93 | 137.93 | ||||||||||
| C) | ADB WORKS | |||||||||||||||
| 1 | Improvement to Taladanda Canal from RD 00 to 11.750 Km ( Widening of right bank road from rD 8.870 to 12.121 Km ) | 116.10 | 116.10 | 99.40 | M/s B B Construction | 24.04.08 23.08.08 |
Work Completed | 116.10 | 99.48 | 8.33 | ||||||
| Total | 116.10 | 116.10 | 99.40 | 116.10 | 99.48 | 8.33 | ||||||||||
| D) | STATE MARITIME MUSEUM | |||||||||||||||
| 1 | Odisha State Maritime Museum at Jobra Work shop | - | 811.40 | 811.40 | INTACH India Council of Conservation Institute, Lucknow | 15.05.08 14.05.11 |
Work under Progress | 203.00 | 203.00 | 47.00 | ||||||
| Total | 0.00 | 811.40 | 811.40 | 203.00 | 203.00 | 47.00 | ||||||||||
| Statement showing the Industry wise collection of Water -cess for the last Five Years under Mahanadi South Division, Cuttack | |||||||
| Sl No | Name of the Industry | 2005-06 | 2006-07 | 2007-08 | 2008-09 | 2009-10 (till date) |
Remarks |
| 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 |
| 1 | M/s Paradeep Port Trust, Paradeep | 858785.00 | 1597716.00 | 861138.00 | 858785.00 | 72938.00 | Certificate case No. 2/06 filed by the Tahasildar, Kujanga in the Court of Collector and District Magistrate Jagatsinghpur |
| 2 | M/s Paradeep Phosphates Limited, Paradeep | 5102536.00 | 2844266.00 | 3120593.00 | 2626982.00 | 221247.00 | The PPL filed a revision appeal bearing No. 1/06 before the Court of Member, Board of Revenue, Cuttack |
| 3 | IFFCO Ltd. Paradeep. | 1332904.00 | 5240575.00 | 5877700.00 | 5341475.00 | 332725.00 | |
| 4 | M/s SKOL Breweries Ltd., Paradeep | 113134.00 | 95723.00 | 103028.00 | 115551.00 | 8978.00 | |
| 5 | M/s Hemakunda Ice Factory Limited, Paradeep | 8000.00 | 5000.00 | - | 7000.00 | - | |
| 6 | Goa Carbons Ltd. Paradeep | 235885.00 | 47290.00 | 31353.00 | 37630.00 | 2552.00 | |
| 7 | ESSAR Steel Ltd. | - | - | 120000.00 | 15275.00 | - | |
| Total | 7651244.00 | 9830570.00 | 10113812.00 | 9002698.00 | 638440.00 | ||
Information Compiled by DRDA,Jagatsinghpur during the Visit of RDC(CD)
![]()
Site Designed and Developed by National Informatics Centre,Jagatsinghpur. Telephone : 06724 220035
Best Viewed with Internet Explorer 4.0 Browser Under 800 x 600 Resolution